PROJECT DESCRIPTION This contract was for the development of Aasleagh Cottages, which are fishing cottages overlooking Killary Harbour and surrounded by the Connemara Mountains, along the western seafront of Ireland.   The main elements of the building were demolished, with only the front and gable facades of the...

PROJECT DESCRIPTION This contract consisted of the construction of a new office building on the Shannonside dairy ingredients facility in Ballaghaderreen, Co. Roscommon, a part of the Connacht Gold network of operations.  Connacht Gold is a diversified business with activities in consumer foods, dairy ingredients and...

PROJECT DESCRIPTION Kenaidan were awarded the expansion of the Kerry County Airport car park. Work involved expansion of the car park by 6,250m2 and re-surfacing of 7,850m2 of existing car park.   A new concrete blast wall between the apron and the existing car park was included in...

PROJECT DESCRIPTION This project was completed in 2017 for Aurivo Dairy Ingredients. The works consisted of upgrade works to an existing building to create new Locker room, changing room facilities, Laboratory Building and State of the art segregated Access Corridor. These works were undertaken in a...

PROJECT DESCRIPTION This project was completed in February 2018 for Aurivo Dairy Ingredients. The works involved the removal of existing mild steel gantries and replacement with stainless steel, removal of wall and floor finishes and replacement with epoxy coatings.   Other works included reconfiguration and upgrading of internal door...

PROJECT DESCRIPTION This project commenced in June 2019 and was completed by the end of July 2019.   Works consisted of the demolition of the existing office with partitions, doors, ceilings and glazed screens & partitions removed. Existing floor finishes were also lifted. New metal stud partitions were erected,...

PROJECT DESCRIPTION This project commenced in June 2018 and was completed in December 2018.   The works consisted of the following: A 4m reduced level excavation for the placement of reinforced concrete foundations. The diversion of existing below ground services within the footprint of the new extension. Placement...

PROJECT DESCRIPTION This project for Mayo County Council was completed in November 2019.   The purpose of this project was to return Pearse Street in Ballina to its original state by carefully removing any modern PVC windows and replacing them with ‘of the period’ timber sash windows. Any...

PROJECT DESCRIPTION This project for Ireland West Airport Knock, Co. Mayo was completed in September 2019. The client, Ireland West Airport Knock, required the refurbishment of one of their properties to provide office, meeting room, gym and welfare facilities to their staff, and in particular members of...

PROJECT DESCRIPTION This Project commenced in June 2018 and was completed at the end of November 2018. The works were completed and handed over in a 2 phased approach to ensure that airport users were not adversely affected during the construction works as the new.   Full height...